Benton County, Iowa on behalf of the Middle Cedar Watershed Management Authority (MCWMA) is seeking a written Statement of Qualifications (SOQ) from certified Engineers in the State of Iowa. SOQs should be submitted to:
Adam Rodenberg
700 16th St NE, Suite 301
Cedar Rapids, IA 52402
SOQs must be submitted as one hard copy and one electronic copy no later than 3:00 pm November 15th, 2017. Hard copies must be post marked by the due date or delivered directly. Electronic copies must be submitted as a PDF with the subject line, “Middle Cedar Engineering Services”. Electronic submissions should be sent to the following email address:
Adam Rodenberg
arodenberg@co.benton.ia.us
Responses to this RFQ should be single spaced, Times New Roman or Arial font size of at least 11, margins no less than 0.75 inch, and limited to 10 pages double-sided between bound covers, not including blank dividers. Number all pages consecutively. Responses not adhering to these stipulations will not be considered. Inclusion of promotional literature of a general nature is not solicited, but if included, will count toward the overall length restriction.
For more information: Middle Cedar RFQ
Leave a Reply
Want to join the discussion?Feel free to contribute!